Sold: Seaforth Avenue Townhouses

04.02.13

Liedig Building Group is pleased to announce that all four townhouses at 1B-1E Seaforth Avenue Dover Gardens have been sold.

Below is a copy of the real estate marketing campaign for the project:

1B, 1C, 1D & 1E Seaforth Avenue Dover Gardens

"ALL NOW SOLD  - MANY DISAPPOINTED BUYERS

Combinations of 3 good size bedrooms, both with ensuites and sparkling main bathrooms that service the other two bedrooms. Residence 1D has an upstairs activities room. Both residences downstairs include an entrance hallway, quality kitchen with plenty of bench space, stainless steel appliances and adjacent family and dining rooms. Each residence also has a front room looking out onto the street which could be used as an additional separate living room or perhaps a study or fourth bedroom. Ducted reverse cycle air conditioning provides year round temperature control. Residence 1D has double garaging and both have internal access to the house. Fully landscaped gardens complete this classy development.

Residence 1 SOLD Lot 701 1E 175m2
Residence 2 SOLD Lot 702 1D 202m2
Residence 3 SOLD Lot 703 1C 202m2
Residence 4 SOLD Lot 704 1B 218m2

1D Building area 202m2
1E Building area 175m2

Minutes from Brighton and Seacliff Beaches, Jetty Road, cafes and restaurants, private and public schooling and public transport."

Special Thanks goes out to Gavin Langridge from GP Langridge Realestate

Featured Projects

  • Collins Reserve Extension

    Collins Reserve Extension

     

     

     

    New building extension to existing clubrooms including provision of extended changeroom facilities to accomodate female players and officials, including:

    • minor demolition works
    • construction of timber framed structure on a reinforced concrete slab
    • fit-out of a new home and away female player changerooms, shower facilities, official's changeroom, male and female massage rooms and an office
    • upgrade of the existing accessible bathroom within the existing clubrooms
  • Henley Town Hall Restoration

    Henley Town Hall Restoration

     

     

     

    Project Value: $133k

    Council: City of Charles Sturt

     

    LBG was engaged to undertake the heritage restoration of the Henley Beach Town Hall. Works included masonry repointing with a lime putty mortar and heritage window replacement and painting.

  • Woodville Town Hall Upgrade

    Woodville Town Hall Upgrade

     

     

     

    Liedig Building Group were engaged by the City of Charles Sturt to restore the Woodville Town Hall in 2014. This project of historical significance to the local community involved the replacement of top chord trusses, replacement of heritage ceilings and supporting structural framing, timber flooring and other associated works. The works were completed ahead of time with Practical Completion being achieved in Feburary 2015.

     

    Major Project Challenges:

    • Working around a failed truss elements in a safe manner
    • Modifying roof trusses while extensive airconditioning plant was in place
    • Undertaking the majority of structural roof repairs in winter
    • Replacement of heritage ceilings to match existing
    • Protection of the hall from damage throughout the construction process
Copyright © 2021 Liedig Building Group
atomix - website design adelaide